Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 (Old NH-3) (Design length 19.712 km.) under NH (O) in the State of Maharashtra on Hybrid Annuity Mode
Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 (Old NH-3) (Design length 19.712 km.) under NH (O) in the State of Maharashtra on Hybrid Annuity Mode
Construction of Four-Lane Greenfield Delhi – Amritsar – Katra Expressway from junction with Ambala – Kaithal – Hissar Road ( NH 152) near Kharak Pandwa Village to junction with Patiala – Samana – Patran Road ( SS 10) Near Ghagga Village (KM 120+250 to KM 157+920) under Bharatmala Pariyojana in the state of Haryana and Punjab on Hybrid Annuity mode.
2
Project Length
37.67 Km.
3
Authority
National Highways Authority of India
4
Concessionaire
CDS DAK-5 Expressway Private Limited.
5
Independent Engineer
SA Infrastructure Consultants Pvt. Ltd in JV with M/s Upham International Corporation.